01
Water Test
We test your raw water with a water hardness test kit and a TDS meter, checking hardness in grains per gallon, iron, pH, and total dissolved solids. For well homes we also check for iron bacteria and sediment load. This takes about 20 minutes and tells us exactly what your system needs to remove.
02
System Sizing
Based on your test results, household size, and peak flow demand, we spec the resin tank size, carbon stage, and control head. A family of four in Hastings Farms usually needs a different setup than a two-person home in The Pecans. We walk you through the options and the price before we order anything.
03
Installation Day
Most installs take three to five hours. We cut into the main line at the point of entry, usually in the garage or a utility closet, and plumb in the filter housings, resin tank, brine tank, and bypass valve using pex tubing or copper. We pressure-test every joint before we turn the water back on.
04
Programming and Flush
We set the control head for your water hardness and household size, then run a full manual regeneration to flush the resin and carbon beds. You will see slightly discolored water for the first few minutes, which is normal. After the flush, we re-test the treated water to confirm it hits target hardness.
05
Walkthrough and Handoff
Before we leave, we show you how to add salt, how to check the brine tank for salt bridge, and how to use the bypass valve if you ever need to isolate the system. We leave the test results and a maintenance schedule. You get a direct number for questions, not a call center.